單項(xiàng)選擇題在軟件配置管理中,版本控制的目的是按照一定的規(guī)則保存配置項(xiàng)的()

A.重要版本 
B.基線版本 
C.所有版本 
D.需要得版本


你可能感興趣的試題

1.單項(xiàng)選擇題The most crucial time for project risk assessment is ( ).

A. when a problem surfaces
B. during the planning phase
C. during the close-out phase
D. after the project schedule has been published

3.單項(xiàng)選擇題

The communication management plan determines the information and communications needs of the stakeholders. In the following statements related to communication management plan.  (     ) is false.
 

A. The communication management plan is contained in or is a subsidiary plan of, the project management plan.
B. The  communication  management  plan  can  be  formal  or informal, highly detailed or broadly framed, and based on the needs of the project.
C. The  communication  manamgement  plan  organize  and summarize the information gathered,and present the results of any analysis as comparedthe performance measurement baseline.
D. The communication management plan can include guidelines project status meetings,project team meetings,e-meetines,and e-mail

5.單項(xiàng)選擇題在配置管理中,用于管理當(dāng)前基線和控制對(duì)基線的變更的配置庫(kù)是()

A.動(dòng)態(tài)庫(kù) 
B.備份庫(kù) 
C.受控庫(kù) 
D.靜態(tài)庫(kù)

最新試題

項(xiàng)目組合經(jīng)理主要職責(zé)不包括()

題型:?jiǎn)雾?xiàng)選擇題

項(xiàng)目組合經(jīng)理需要具備的專業(yè)知識(shí)不包括()

題型:?jiǎn)雾?xiàng)選擇題

選擇和管理供應(yīng)商能力域?qū)?yīng)的能力域類別是()

題型:?jiǎn)雾?xiàng)選擇題

組織級(jí)項(xiàng)目管理的組織驅(qū)動(dòng)因素不包括()

題型:?jiǎn)雾?xiàng)選擇題

CMMI即能力成熟度模型集成,共分為5個(gè)等級(jí),當(dāng)達(dá)到()開始,要求組織針對(duì)過(guò)程的管理能夠量化分析和量化預(yù)測(cè)。

題型:?jiǎn)雾?xiàng)選擇題

CMMI將所有收集并論證過(guò)的最佳實(shí)踐按邏輯歸為4大能力域類別,不包括()

題型:?jiǎn)雾?xiàng)選擇題

CMMI評(píng)估的方法不包括()

題型:?jiǎn)雾?xiàng)選擇題

PRINGE2(受控環(huán)境下的項(xiàng)目管理)是一種基于()的項(xiàng)目管理方法。

題型:?jiǎn)雾?xiàng)選擇題

過(guò)程性能的量化監(jiān)控至少包含()①監(jiān)控過(guò)程性能是否穩(wěn)定②性能目標(biāo)的范圍是否滿足規(guī)格要求③監(jiān)控過(guò)程性能是否滿足規(guī)格要求④同類問(wèn)題是否在后續(xù)過(guò)程中再次發(fā)生

題型:?jiǎn)雾?xiàng)選擇題

產(chǎn)能管理主要涉及4個(gè)類別,不包含()

題型:?jiǎn)雾?xiàng)選擇題