單項(xiàng)選擇題在Windows9X中,若在某一文檔中連續(xù)進(jìn)行了多次剪切操作,當(dāng)關(guān)閉該文檔后剪貼板中存放的是()。

A.空白
B.所有剪切過(guò)的內(nèi)容
C.最后一次剪切的內(nèi)容
D.第一次剪切的內(nèi)容


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題在Windows9X中,能彈出對(duì)話框的操作是()。

A.選擇了帶省略號(hào)的菜單項(xiàng)
B.選擇了帶向右三角形箭頭的菜單項(xiàng)
C.選擇了顏色變灰的菜單項(xiàng)
D.運(yùn)行了與對(duì)話框?qū)?yīng)的應(yīng)用程序

2.單項(xiàng)選擇題把Windows9X的窗口和對(duì)話框作一比較,窗口可以移動(dòng)和改變大小,而對(duì)話框()。

A.既不能移動(dòng),也不能改變大小
B.僅可以移動(dòng),不能改變大小
C.僅可以改變大小,不能移動(dòng)
D.既能移動(dòng),也能改變大小

3.單項(xiàng)選擇題Windows9x“桌面”指的是()。

A.整個(gè)屏幕
B.全部窗口
C.某個(gè)窗口
D.活動(dòng)窗口

4.單項(xiàng)選擇題在Windows9X的“資源管理器”窗口左部,單擊文件夾圖標(biāo)左側(cè)的減號(hào)(-)后,屏幕上顯示結(jié)果的變化是()。

A.該文件夾的下級(jí)文件夾顯示在窗口右部
B.窗口左部顯示的該文件夾的下級(jí)文件夾消失
C.該文件夾的下級(jí)文件顯示在窗口左部
D.窗口右部顯示的該文件夾的下級(jí)文件夾消失

5.單項(xiàng)選擇題設(shè)Windows9X桌面上已經(jīng)有某應(yīng)用程序的圖標(biāo),要運(yùn)行該程序,可以()。

A.用鼠標(biāo)左鍵單擊該圖標(biāo)
B.用鼠標(biāo)右鍵單擊該圖標(biāo)
C.用鼠標(biāo)左鍵雙擊該圖標(biāo)
D.用鼠標(biāo)右鍵雙擊該圖標(biāo)

最新試題

翻譯:The application of physics to the study of rocks (geophysics)is very important in petroleum geology. In its broadest application geophysics makes a major contribution to understanding the earths crust and, especially through the application of modern plate tectonic(板塊構(gòu)造)theory, the genesis and petroleum potential of sedimentary basins. More specially, physical concepts are required to understand folds(褶皺), faults(斷層), and diapers(底辟), and hence their roles in petroleum entrapment.

題型:?jiǎn)柎痤}

翻譯:Practically every rig uses internal-combustion engines as its prime power source, or its prime mover.

題型:?jiǎn)柎痤}

翻譯:The HF-HCI mixture (usually 3-percent HF and 12-percent HCI) then is injected. The HF reacts with calys, sand, drilling mud, or cement filtrate to improve permeability near the well-bore.The HCI will not react and is present to keep the PH low, preventing precipitation of HF reaction products. Sent to keep the PH low, preventing precipitation of HF reaction products.

題型:?jiǎn)柎痤}

翻譯:crude petroleum is not an equilibrium mixture, and on a geological time scale its composition is slowly changing. S.R.silverman found that heating at 121C for two weeks caused detectable changes, the low-molecular-weight components formed being isotopically lighter so far as the carbon was concerned, than the original.

題型:?jiǎn)柎痤}

翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.

題型:?jiǎn)柎痤}

翻譯:There are two approaches to the problem of determining the fluid saturation within a reservoir rock. The direct approach is to measure, in the laboratory, the saturation of selected rock samples recovered from the parent formation. The indirect approach is to determine the fluid saturation by measuring some related physical property of the rock.

題型:?jiǎn)柎痤}

翻譯:This chapter deals with the fundamental properties of reservoir rocks. The properties discussed are (1) porosity - a measure of the void space in a rock; (2) Permeability - a measure of the fluid transmissivity of a rock; and (3) fluid saturation - a measure of the gross void space occupied by a fluid. These properties constitute a set of fundamental parameters by which the rock may be described quantitatively.

題型:?jiǎn)柎痤}

翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.

題型:?jiǎn)柎痤}

翻譯:An acidizing treatment for a sandstone formation normally will consist of sequentially injecting three fluids---a preflush, the hydrofluoric acid hydrochloric acid mixture, and an after flush. These fluids serve definite purposes.

題型:?jiǎn)柎痤}

翻譯:Land maps are essential in establishing control wells and provide fundamental orientation. As Fig.2 illustrates, land maps which are readily available within most companies as well as readily available commercially, provide offset operators, total depth, formation tops and development dates. The land map is essential in establishing orientation and control.

題型:?jiǎn)柎痤}