A.the estimated cost of damage
B.the name of the owner or agent of the vessel
C.an evaluation of who was at fault
D.the amount of ballast on board
您可能感興趣的試卷
你可能感興趣的試題
A.Notice of Demurrage
B.Survey Report
C.Notice of Readiness
D.Notice of Responsibility
A.At
B.On
C.Of
D.In
最新試題
I undertake to bring to the notice of the Suez Canal Authorities,before my vessel()the Canal,any defects which may appear.
The Experimental Lighthouse-buoy has no navigational significance and may be removed at will.The above sentence means().
Notice of Readiness to Load must be served()the Charterer or his agent.
On one hand,you have to continue loading,on()hand,I’ll contact the Despatch Office right now.
Please return the notice to me()due time.
I’m not fully aware()what happened at the loading port.
MV SKYCLIPPER RE OUR TELCONV YDAY N PREVEIOUS TLX DD 24 JUL HV SPKN TO OWNER N UR RECFM TO Z FLWG NORDER ENSURE VSLS FXTRE TO U. Following this passage will be().
The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ().
Ships changing their location within the port limits are also required to report their new ().
The external flotation bladder on an immersion suit should be inflated().