A.need
B.need not
C.will
D.to
您可能感興趣的試卷
你可能感興趣的試題
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
最新試題
Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
The object of the both-to-blame collision clause is().
An action for indemnity against a third person may()after the expiration of the year if brought within the time allowed by the law of the court seized of the case.
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
Freight rates are mostly charged().
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.