單項選擇題Usually it will be()who will be liable for the payment of demurrage.

A.the Shipowner
B.the shipper
C.the carrier
D.the Charterer


您可能感興趣的試卷

最新試題

The fixing of a canceling date on a charter-party merely()warning to the Shipowner that non-arrival by this date may result so as to entitle the Charterer to rescind.

題型:單項選擇題

The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.

題型:單項選擇題

If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.

題型:單項選擇題

If the Shipowner proves that prima facie the cause of damage was excepted,the burden ofproof shifts to().

題型:單項選擇題

The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.

題型:單項選擇題

The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().

題型:單項選擇題

Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().

題型:單項選擇題

That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.

題型:單項選擇題

The importance of the distinction between a charter by demise and a charter party proper()that under the former the master is the agent of the Charterer,not of the Shipowner.

題型:單項選擇題

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().

題型:單項選擇題