A.the Shipowner
B.the shipper
C.the carrier
D.the Charterer
您可能感興趣的試卷
你可能感興趣的試題
A.the consignee
B.the consignor
C.the owner
D.the Charterer
A.Receivers
B.Consignees
C.Charterers
D.Cargoowners
A.where
B.which
C.that
D.whether
A.the Charterer
B.the Shipowner
C.the merchant
D.the shipper
A.whether
B.if
C.unless
D.that
最新試題
The fixing of a canceling date on a charter-party merely()warning to the Shipowner that non-arrival by this date may result so as to entitle the Charterer to rescind.
The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.
If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.
If the Shipowner proves that prima facie the cause of damage was excepted,the burden ofproof shifts to().
The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.
The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.
The importance of the distinction between a charter by demise and a charter party proper()that under the former the master is the agent of the Charterer,not of the Shipowner.
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().