A.entirely damaged
B.prejudice
C.total loss
D.injury
您可能感興趣的試卷
你可能感興趣的試題
A.damage
B.prejudice
C.loss
D.injury
A.the date of declaration
B.date of Notice of Readiness
C.the canceling date
D.the date of delivery
A.information of the of the vessel
B.Notice of Readiness
C.Declaration of the Condition of the Vessel
D.Declaration of DWT or Net DWT
A.Buyers
B.Sellers
C.either the Buyers or the Sellers
D.neither the Buyers no the Sellers
A.pressing and urgent
B.impetuous
C.persecuted
D.outright and definite
最新試題
A stretch where the channel changes from one side of the river to the other is called a ().
A towing light is().
A traffic separation zone is that part of a traffic separation scheme which().
A tug is “in irons” when held in a fixed position by()
A squeeze-grip type carbon dioxide portable fire extinguisher has been partially discharged. It should be().
A spanner is a ().
A tank 36 ft. by 36 ft. by 6 ft. is filled with water to a depth of 5 ft. If a bulkhead is placed in the center of the tank running fore-and-aft along the 36-foot axis,how will the value of the moment of inertia of the free surface be affected?()
A tow can override its tug as a result of().
A twin-screw vessel with a single rudder is making headway. The engines are full speed ahead. There is no wind or current. Which statement is FALSE? ()
A towing vessel’s fire detection system may be certified to comply with the Coast Guard’s towing vessel fire protection regulations by().