A.prevent stress concentration in the bulwark
B.permit easy jettison of deck cargo in an emergency
C.provide openings through the bulwarks for mooring lin
D.allow water shipped on deck to flow off rapidly
您可能感興趣的試卷
你可能感興趣的試題
A.can be used in conjunction with wire or spring-lay rope
B.can be stored on decks exposed to sunlight
C.can hold a load even when a considerable amount of the yarns have been abraded
D.gives audible warning of overstress whereas manila does not
A.date of the test
B.load at which a test sample broke
C.name of the vessel
D.number of strands and of wires in each strand
A.stackers
B.twistlock
C.bridge fittings
D.containment booms
A.a bulge in the wire where the strain occurred
B.a decrease in diameter where the strain occurred
C.a kink in the wire where the strain occurred
D.no visible effects of an overstrain
A.breakout wrench
B.makeup tongs
C.chain tongs
D.pipe spinner
最新試題
The period of your()onboard the vessel as Captain is 8 months from the date of your flight if you are joining a vessel outside the country.
Nylon line is better suited than manila for().
In the stowage of deck cargo,cribbing is().
The freight will not be payable()the goods are delivered in such a condition that they are substantially and in a mercantile sense the same goods as those shipped.
A sufficient amount of chain must be veered when anchoring a vessel to ensure().
Mousing a cargo hook with marline or small line().
The release of the attached ship can()only by provision of bail,usually a very large sum.
If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().
Peck and Hale gear is used most commonly for securing().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.