A.running rigging leading aft from the masts
B.running rigging leading forward from the masts
C.standing rigging leading aft from the masts
D.standing rigging from the cross trees to the mast head
您可能感興趣的試卷
你可能感興趣的試題
A.including
B.besides
C.except
D.in addition to
A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor
A.slipway
B.graving dock
C.ground warp
D.caisson dock
A.Moving high weights lower
B.Adding weight at the tipping center
C.Moving a weight forward
D.Moving lower weight high
最新試題
How should you signal the crane operator to move slowly().
Damage by()shall not be considered as handling damage.
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
The Master or person in charge of a ship shall ensure the crane record book shows the().
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
What is/are the advantage(s)of cranes over conventional cargo booms().
When viewed from above,the best position for the guy in relation to the boom is().
The net productivity per gang-hour can be improved through a decrease of().