單項(xiàng)選擇題The proper place()the sling is made up is the square of the hatch.

A.which
B.where
C.when
D.how


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().

A.maximum counter weight required
B.minimum horsepower required
C.hoist rope strength
D.allowable load

3.單項(xiàng)選擇題The boom indicator tells the operator at what angle the boom is compared to the().

A.horizontal position of the boom
B.vertical position of the boom
C.horizontal position of the load being lifted
D.vertical position of the load being lifted

4.單項(xiàng)選擇題The boom indicator on a crane will indicate the().

A.length of the boom
B.angle of the boom
C.lifting capacity of the boom
D.direction of the boom

5.單項(xiàng)選擇題Stop()the derrick at once,the gooseneck is bent.

A.to use
B.to operate
C.maneuvering
D.using