A.heart
B.hearts
C.mind
D.minds
您可能感興趣的試卷
你可能感興趣的試題
A.to discharge
B.discharge
C.discharging
D.to be discharging
A.load
B.loading
C.will load
D.to load
A.riser stabilizers
B.guideline tensioning system
C.riser tensioning system
D.guideline stabilizers
A.discharge
B.recircle
C.load
D.take in
A.out
B.beyond
C.from
D.off
最新試題
Official draft measurements should be()by authorized persons,agreed by both parties involved.
The Master or person in charge of a ship shall ensure the crane record book shows the().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
Running an electric winch at slow speed over a long period of time causes().
What is the purpose of the equalizing beam aboard a crane vessel().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
The item()is not the advantage of the hydraulic winch.
When discharging an oil cargo,the first consideration is to().