A.Reduce the loading rate
B.Notify the engine room of the procedure
C.Maintain communications with the dock man
D.Give the operation your undivided attention
您可能感興趣的試卷
你可能感興趣的試題
A.A prohibition from loading a cargo from a country when the cargo may be a carrier of infectious diseases
B.Arrest of a vessel by legal authorities to satisfy claims through exercise of a maritime lien
C.Damage caused by riot of the population of a port
D.Losses caused by fines from polluting the harbor after malfunction of a piping system
A.They are self-priming
B.Decreasing the speed of rotation will decrease the discharge pressure
C.Opening the discharge valve wider will increase the discharge pressure
D.All of the above
A.heart
B.hearts
C.mind
D.minds
A.to discharge
B.discharge
C.discharging
D.to be discharging
A.load
B.loading
C.will load
D.to load
最新試題
Official draft measurements should be()by authorized persons,agreed by both parties involved.
When discharging an oil cargo,the first consideration is to().
When viewed from above,the best position for the guy in relation to the boom is().
The Master or person in charge of a ship shall ensure the crane record book shows the().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
Which method should be used to warm up the pump turbines prior to discharge().
The item()is not the advantage of the hydraulic winch.
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
How should you signal the crane operator to lower the boom and raise the load().