A.Electrical loading
B.Mechanical distribution
C.Compressibility of air
D.Mechanical friction
您可能感興趣的試卷
你可能感興趣的試題
A.Maximum mooring line tension divided by the anchor's weight in air
B.Anchor's weight in air divided by the maximum mooring line tension
C.Preloading tension divided by the anchor's weight in air
D.Operating tension divided by the anchor's weight in air
A.Absorb erosion of high velocity discharge stream
B.Seal pump shaft against entry of air
C.Isolate the outlet side from the inlet side
D.Dampen the turbulent discharge flow
A.Oil temperature
B.Manifold pressure
C.Exhaust gas temperature
D.Fuel consumption
A.Enforcement of smoking restrictions
B.Restricting vessels from coming alongside the barge
C.Insuring that a combustible gas indicator is aboard
D.Protecting cargo hose with chafing gear
A.Reduce the loading rate
B.Notify the engine room of the procedure
C.Maintain communications with the dock man
D.Give the operation your undivided attention
最新試題
Damage by()shall not be considered as handling damage.
The net productivity per gang-hour can be improved through a decrease of().
The item()is not the advantage of the hydraulic winch.
How should you signal the crane operator to move slowly().
They()loading at 1400 hours.
Running an electric winch at slow speed over a long period of time causes().
The Master or person in charge of a ship shall ensure the crane record book shows the().
Which statement comparing a shipboard crane to conventional gear is TRUE().
What is meant by the term“l(fā)uffing the boom”of a crane().
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().