A.Cranes/derricks
B.Crane/derrick cycles
C.Crane/derrick cycle time
D.Weight per package
您可能感興趣的試卷
你可能感興趣的試題
A.Date and description of each failure
B.Average load in pounds for each usage
C.Total number of lifts for each usage
D.All of the above
A.less jerky starts
B.less jerky stops
C.overheating worries
D.none of the overheating worries
A.breaking a cargo runner
B.parting guys topping lifts
C.carrying away a block
D.overheating the resistors and eventually burning out
A.the speed to be retarded by the friction brake
B.a load to go downward at full speed
C.the circuit breaker to turn off
D.the resistors to overheat and eventually burn out
A.International Cargo Bureau Regulations
B.Load Line Regulations
C.Rules and Regulations for Cargo and Miscellaneous Vessels
D.Vessel's classification society rules and regulations
最新試題
The item()is not the advantage of the hydraulic winch.
Most pedestal crane power is provided by().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
The Master or person in charge of a ship shall ensure the crane record book shows the().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
What does “evel-luffing” accomplish during crane operations().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().
Damage by()shall not be considered as handling damage.
Which method should be used to warm up the pump turbines prior to discharge().