A.placing bunker on the deck
B.building a stage on which to place the cargo
C.welding steel feet to the deck,on which the cargo is placed
D.erecting vertical pillars under the deck to support the cargo
您可能感興趣的試卷
你可能感興趣的試題
A.pump fuel oil from midships to the ends of the vessel
B.reduce speed
C.take a course which most eases the vessel
D.All of the above
A.bow
B.mid-section
C.stern
D.All of the above
A.hogging
B.sagging
C.stiff
D.tender
A.hogging
B.stiffness
C.sagging
D.listing
A.Compression
B.Tension
C.Thrust
D.Racking
最新試題
Vertical structural members attached to the floors that add strength to the floors are called().
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
Floors aboard ship are().
If your vessel is aground at the bow,it would be preferable that any weight removals be made from the().
The central longitudinal structural hull strength member of the lower hulls of semisubmersible ship’s is called the().
If a vessel is sagging,what kind of stress is placed on the sheer strake?()
What does the proof test load of an anchor chain demonstrate?()
The decks of a ship are supported by transverse members called().
The normal tendency for a loaded tanker is to().
If the weights are moved away from the midship section,()will happen on board.