A.opening dead spaces to check for heat or fire
B.evacuation of the vessel
C.sounding the "all clear" signal
D.operation of the emergency generator
您可能感興趣的試卷
你可能感興趣的試題
A.day
B.week
C.month
D.year
A.the Muster List ("Station Bill") is posted in each compartment
B.temporary personnel and visitors are advised of emergency stations
C.names of crew members are listed on the Muster List ("Station Bill")
D.no changes are made to the Muster List ("Station Bill")
A.No equipment is provided
B.Glue and rubber patches
C.Several various-sized sealing clamps
D.Self-adhesive rubberized canvas patches
A.trick wheel
B.rapson slide
C.follow-up gear
D.receiver unit
A.vessel has turned 90°From her original course
B.vessel has turned 60°From her original course
C.vessel is on a reciprocal course
D.emergency turn signal sounds
最新試題
The deck water seal of the inert gas system().
If an emergency pump control is used as the emergency shutdown on a tank vessel,it must().
After having activated the emergency position indicating radio beacon,you should().
After an explosion,repair of emergency machinery and services should be accomplished().
Coast Guard regulations require a shipboard Oil Pollution Emergency Plan to be reviewed().
In an emergency,the electro-hydraulic steering units can be directly controlled by the().
The Muster List (“Station Bill”) shows each person’s lifeboat station,duties during abandonment,basic instructions,and().
Cargo vessels being navigated,and fitted with emergency lighting and power systems,shall have their emergency systems tested at least once().
On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().
The vessel’s Emergency Position Indicating Radio beacon (EPIRB) must be tested().