A.keep them dry when the bilges are full of water
B.keep them cool when the vessel is underway
C.make them more accessible for repairs
D.prevent accidental ignition of any gasoline vapors that may have accumulated in the bilges
您可能感興趣的試卷
你可能感興趣的試題
A.parcelling
B.parbuckling
C.caulking
D.seizing
A.wrought-iron
B.aluminum
C.high-tensile steel
D.mild steel
A.free surface effects
B.capsizing
C.continued progressive flooding
D.wind heel
A.Toxic gasses may be present
B.Flammable gasses may be present
C.Liquid muds may flood adjoining spaces
D.An oxygen-deficient atmosphere may be present
A.tour reports
B.hull reports
C.machinery repair record book
D.deck equipment log
最新試題
We have come on board to check with you on the main items of repairs as stated in the().
Damage to ship’s fittings caused by stevedore’s negligence often happens.Therefore,the stevedores()the cost of repairs effected.
Please have the damage to the gangway().
The Loran needs().
Point out which one of the following items is not in the charge of Chief Officer in repairing operation().
Manifest and cargo plan are the two most important shipping papers required for().
Small hull leaks can be temporarily repaired by().
The equipment is very old.It’s not worth().
Rivets are usually made of().
The Certificate of Inspection of a damaged tank barge has expired. What certificate authorizes the barge to move to a repair facility for repair and inspection?()