A.a request for assistance
B.the location of the unit at the time of the casualty
C.an estimate of the cost to repair damages
D.the amount of fuel remaining
您可能感興趣的試卷
你可能感興趣的試題
A.repairing
B.to repair
C.repairs
D.have repaired
A.repairing
B.to repair
C.repair
D.to be repaired
A.moved and fitted again
B.removed and refitted
C.reproduced and put on again
D.returned and attached again
A.has repaired
B.is being repaired
C.is repaired
D.will be repaired
A.repairing or replacing
B.to repair or to replace
C.being repaired or replaced
D.to be repaired or replaced
最新試題
Starting motors,generators,and other spark producing devices should be mounted as high above the bilges as possible to().
The equipment is very old.It’s not worth().
Manifest and cargo plan are the two most important shipping papers required for().
The damaged cargo is not allowed to export without().
Repairing damage to the hull at or above the waterline reduces the threat of().
Under the Vessel Bridge-to-Bridge Radiotelephone Act,failure of a vessel’s radiotelephone equipment().
The “grip” of a joint represents the().
Please be advised that my radio transmitter broke down and needs().
The order of importance in addressing damage control is().
I hereby request permission to()the ship hull for routine maintenance.