A.one category I 406 Mhz satellite EPIRB
B.at least one life buoy on each side of the vessel fitted with a buoyant life line
C.at least 12 rocket parachute flares
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.at work,only
B.in his or her berthing area,only
C.BOTH at work and in his or her berthing area
D.None of the above
A.have a design burst pressure of at least 25 psig
B.be capable of withstanding at least 2.0 psi vacuum without collapsing or constricting
C.be electrically continuous with a maximum resistance of ten thousand ohms
D.All of the above
A.six weeks
B.six months
C.twelve months
D.two years
A.the name of the unit on which it is located
B.the date that it was installed on the unit
C.the names of the individuals qualified to use it
D.an identification number different from other extinguishers on the unit
A.the pump discharge
B.the manifold connection
C.each fire station discharge
D.the pump station
最新試題
Each hose used for transferring vapors must().
During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().
Each EPIRB required on a ship shall be stowed in a manner which will permit().
Each fire pump on a tanker must have a pressure gauge located at().
Fire may be spread by which means?()
During which condition should the operator of a pedestal crane shutdown operations?()
Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().
Each EPIRB required on an OSV shall be tested using the integrated test circuit and output indicator every().
Fire protection regulations for towing vessels require any fuel line subject to internal head pressure from fuel in the tank to().
During which condition should the operator of a pedestal crane shutdown operations?()