A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a dive survey report
您可能感興趣的試卷
你可能感興趣的試題
A.order list
B.repair list
C.srore list
D.spare parts list
A.the ship type
B.the port's organization
C.the cargo's nature
D.the docker's ability
A.at
B.to
C.for
D.in
A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center
A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline
最新試題
The loading of the ship must be done in accordance with().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
Bales close to the deckhead should be covered to prevent().
The force resulting from the earth’s rotation that causes winds to deflect to the right in the Northern Hemisphere and to the left in the Southern Hemisphere is called().
Berthing means bringing a vessel to her berth until().
Before any loading takes place any signs of the previous cargo should do().
The dew point temperature is().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
A tide is called diurnal when().
Manoeuvring information can not be obtained from().