A.before the stowage plan is made
B.when the stowage plan is made
C.after the stowage plan is made
D.before loading
您可能感興趣的試卷
你可能感興趣的試題
A.after its arrival at the destination
B.during the ship's voyage at sea
C.before they come to the dock
D.during the time when the loading or diacharging is going on
A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires an unproportional number of gang hours of work to discharge the cargo
A.loading
B.leaving
C.arriving
D.sailing
A.of working gangs
B.of idle time
C.in productivity of the working shifts
D.of working hours each working day
A.IBC code
B.BC code
C.IMDG code
D.IGC code
最新試題
Berthing means bringing a vessel to her berth until().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
The company should establish and maintain procedures to control all documents and date which are relevant to().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The loading of the ship must be done in accordance with().
According to the relevant regulation, lifeboat should be powered by().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Before any loading takes place any signs of the previous cargo should do().
The force resulting from the earth’s rotation that causes winds to deflect to the right in the Northern Hemisphere and to the left in the Southern Hemisphere is called().
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()