單項選擇題The stowage factor should be calculated().

A.before the stowage plan is made
B.when the stowage plan is made
C.after the stowage plan is made
D.before loading


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().

A.after its arrival at the destination
B.during the ship's voyage at sea
C.before they come to the dock
D.during the time when the loading or diacharging is going on

2.單項選擇題The tentative cargo plan().

A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires an unproportional number of gang hours of work to discharge the cargo

3.單項選擇題The terminal staff tallies the cargo mainly before the ship’s().

A.loading
B.leaving
C.arriving
D.sailing

4.單項選擇題The total berth time for a vessel can be reduced through a reduction().

A.of working gangs
B.of idle time
C.in productivity of the working shifts
D.of working hours each working day

5.單項選擇題The transportation of dangerous cargo in packages is governed by().

A.IBC code
B.BC code
C.IMDG code
D.IGC code