A.working hours
B.gangs
C.idle time
D.weight per set
您可能感興趣的試卷
你可能感興趣的試題
A.To support the overhang of the stern
B.To strength the plating against the pounding of the sea
C.To add srength to the deck beams which support the weather deck
D.To support the plating of a cylindrical tank
A.will put
B.would put
C.put
D.shall put
A.Put all the remaining cargo on starboard side
B.Put light cargo on starboardside and heavy cargo on port side
C.Put light cargo on port side and heavy cargo on starboard side
D.A,B,C are all correct
A.only when the cargo is within its rail
B.during the time when loading or ynloading is going on
C.after the cargo is checked by tallymen
D.as soon as loading or discharging begins
A.before the stowage plan is made
B.when the stowage plan is made
C.after the stowage plan is made
D.before loading
最新試題
Which of the following is not a form of precipitation?()
The dew point temperature is().
How long are you prohibited to consume alcohol prior to serving as a member of a watch?()
Manoeuvring information can not be obtained from().
What is a CORRECT reply to a pilot’s request, How’s your heading?()
The company should establish and maintain procedures to control all documents and date which are relevant to().
()is on the panel of radar.
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Berthing means bringing a vessel to her berth until().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.