A.GM-available and required
B.Longitudinal stress numberal
C.Tons per inch immersion numeral
D.Draft
您可能感興趣的試卷
你可能感興趣的試題
A.Mean draft
B.Trim
C.displacement
D.Deadweight
A.wooden blocks or dunnage placed between a deck load and the deck
B.the chains and shackles used to secure to deck cargo
C.a crate in which a deck cargo is packaged
D.cardboard separation pieces placed between deck loads to prevent chafing
A.The righting arms at various angles of inclination and displacement
B.The metacentric height at large angle of heel
C.The height of the center of buoyancy at various angles
D.The metacentric radius at various angles
A.which exists when the wind speed is less than 50 knots
B.before collision
C.after flooding
D.at the maximum load
A.contamination
B.oxidation
C.tainting
D.vaporization
最新試題
When the wave period and the apparent rolling period are the same().
Before any loading takes place any signs of the previous cargo should do().
Bales close to the deckhead should be covered to prevent().
()is where the crew eat their meals.
A tide is called diurnal when().
When steering by autopilot,how often should the steering be checked?()
Which of the following shall not the officers in charge of the navigational watch do?()
What is a CORRECT reply to a pilot’s request, How’s your heading?()
()is on the panel of radar.
The helm command PORT TWENTY means().