A.add strength to the bilge well strainer
B.permit rapid flow of water to the bilge wells
C.prevent cargo sifting into the bilge wells
D.preven oil, water , or other liquid from reaching the cargo
您可能感興趣的試卷
你可能感興趣的試題
A.the customs
B.the register bureau of shipping
C.the shipyard fire department
D.a certified gas chemist
A.stanchion
B.brackets
C.web frames
D.deck stringers
A.assist in drydock alignment
B.improve the vessel's stability
C.protect the vessel from slamming against piers
D.reduce the rolling of the vessel
A.pitching increases
B.list increases
C.rolling increases
D.dreft increases
A.cargo which occupies a large volume of space
B.cargo which require refrigeration
C.cargo which is very dense
D.homogeneous cargo not enclosed in a container
最新試題
The mean draft of a ship is the draft().
What is it called when it is possible to ignite the vapour above the oil?()
A tide is called diurnal when().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
The company should establish and maintain procedures to control all documents and date which are relevant to().
The dew point temperature is().
ECDIS must be able to perform all of the following EXCEPT().
The circulation around a low pressure center in the Northern Hemisphere is().
Despite the rising importance and great convenience of the gyrocompass,the magnetic compass still retain its importance because of its().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.