A.dividing the total longitudinal moment summations by displacement
B.dividing th etotal vertical moment summation by displacement
C.multiplying the MTC by the longituinal moments
D.subtracting LCF from LCB
您可能感興趣的試卷
你可能感興趣的試題
A.filling a partially tank
B.using an on board crane to life a freely swinging heavy object
C.emptying a partially filled tank
D.transferring ballast from the forepeak to the after peak
A.vertical moment
B.transverse position of the center of gravity
C.inclining moment
D.righting moment
A.height of the center of gravity A.LCG
B.vertical moment
C.righting moment
D.inclining moment
A.TCG
B.transverse moment
C.righting moment
D.transverse free surface moment
A.bilge pumping capacity
B.reserve buoyancy
C.level attitude
D.instability
最新試題
Manoeuvring information can not be obtained from().
Berthing means bringing a vessel to her berth until().
The ISM code is part of().
It is dangerous for vessels without the operational radar()the estuary.
Which of the following shall not the officers in charge of the navigational watch do?()
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The company should establish and maintain procedures to control all documents and date which are relevant to().
Full details of all lights and fog signals are shown on().
In the Northern hemisphere northerly winds may cause temperature().
The loading of the ship must be done in accordance with().