A.who have performed work for 14 hours
B.who have performed work in a scheduled rest period
C.who have performed work in a scheduled work period
D.who works hard
您可能感興趣的試卷
你可能感興趣的試題
A.give access to
B.links up with
C.have contact with
D.is constructed of
A.14 hours
B.10 hours
C.6 hours
D.It does not matter as long as my overtime is paid for
A.hydrography
B.aids to navigation
C.tidal currents
D.regulatory boundaries
A.Bending moment
B.local strength
C.shear force
D.displacement
A.foul of anchor
B.dropping anchor
C.weighing anchor
D.walking back anchor
最新試題
Manoeuvring information can not be obtained from().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
()is on the panel of radar.
The force resulting from the earth’s rotation that causes winds to deflect to the right in the Northern Hemisphere and to the left in the Southern Hemisphere is called().
()is where the crew eat their meals.
When steering by autopilot,how often should the steering be checked?()
Which of the following is not a form of precipitation?()
What is a CORRECT reply to a pilot’s request, How’s your heading?()
In the Northern hemisphere northerly winds may cause temperature().
It is dangerous for vessels without the operational radar()the estuary.