A.metacentric height is positive
B.metacentric radius is positive
C.KG exceed maximum allowable limits
D.Free surfaces are excessive
您可能感興趣的試卷
你可能感興趣的試題
A.20 minutes
B.15 minutes
C.10 minutes
D.5 minutes
A.2 minutes
B.3 minutes
C.4 minutes
D.5 Minutes
A.who have performed work for 14 hours
B.who have performed work in a scheduled rest period
C.who have performed work in a scheduled work period
D.who works hard
A.give access to
B.links up with
C.have contact with
D.is constructed of
A.14 hours
B.10 hours
C.6 hours
D.It does not matter as long as my overtime is paid for
最新試題
A tide is called diurnal when().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Bales close to the deckhead should be covered to prevent().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
The company should establish and maintain procedures to control all documents and date which are relevant to().
Fog is likely to occur when there is little difference between the dew point and the().
Manoeuvring information can not be obtained from().
It is dangerous for vessels without the operational radar()the estuary.
()is on the panel of radar.
The loading of the ship must be done in accordance with().