單項(xiàng)選擇題下列幾種存儲器中,存取周期最短的是()。

A.內(nèi)存儲器
B.光盤存儲器
C.硬盤存儲器
D.軟件盤存儲器


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題世界上第一臺計(jì)算機(jī)采用的邏輯元件是()。

A.電子管
B.晶體管
C.集成電路
D.大規(guī)模集成電路

2.單項(xiàng)選擇題微機(jī)中1K字節(jié)表示的二進(jìn)制位數(shù)是()。

A.1000
B.8x1000
C.1024
D.8x1024

3.單項(xiàng)選擇題下列四條關(guān)于計(jì)算機(jī)基礎(chǔ)知識的敘述中,正確的一條是()。

A.微型計(jì)算機(jī)是指體積微小的計(jì)算機(jī)
B.存儲器必須在電源電壓正常時(shí)才能存取信息
C.字長32位的計(jì)算機(jī)是指能計(jì)算最大為32位十制數(shù)的計(jì)算機(jī)
D.防止軟盤感染計(jì)算機(jī)病毒的方法是定期對軟盤格式化

4.單項(xiàng)選擇題微型計(jì)算機(jī)中內(nèi)存儲器比外存儲器()。

A.讀寫速度快
B.存儲容量大
C.運(yùn)算速度慢
D.以上三種都可以

最新試題

翻譯:A paraffin base crude is an oil whose chief components are paraffins, and which completely distilled, leaves a solid residue of wax. An asphalt base crude is an oil composed primarily of cyclic compounds (mostly naphthenes) which, when distilled, leaves a solid residue of asphalt. Oils which fall in the middle of these categrories are classified as mixed base.

題型:問答題

翻譯:Other additives are often added to the fracturing fluids for special proposes. Corrosion inhibitors may be used if the fracturing fluids might cause corrosion in the tubular goods in the well.Other additives are used to make the part of the fracturing fluid which is moving against the pipe walls behave almost like lubricating oil while the remaining fracturing fluid take an almost solid form to carry the maximum amount of proppant.

題型:問答題

翻譯:In the chapter and the next some aspects of rod pumping and of the instruments used to analyze pumping well behavior are discussed. Many different pumping systems are in current use , e.g. , conventional sucker rod pumping, long-stroke pumping , hydraulic ,centrifugal,and sonic pumping ,but no attempt is made to deal here with any other method than convention a sucker rod pumping.

題型:問答題

翻譯:Gas lift is the method of artificial lift that uses an external source of high-pressure gas for supplementing formation gas to lift the well fluids. The primary consideration in the selection of availability and compression cost of gas.

題型:問答題

翻譯:The HF-HCI mixture (usually 3-percent HF and 12-percent HCI) then is injected. The HF reacts with calys, sand, drilling mud, or cement filtrate to improve permeability near the well-bore.The HCI will not react and is present to keep the PH low, preventing precipitation of HF reaction products. Sent to keep the PH low, preventing precipitation of HF reaction products.

題型:問答題

翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.

題型:問答題

翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.

題型:問答題

翻譯:In addition to being useful as an exploration tool, subsurface maps are a necessary part of any reservoir engineering study; and petroleum engineers, as well as geologists, must be completely familiar with their construction and interpretation.

題型:問答題

翻譯:Nearly three-fifths of all known petroleum reserves on Earth is to be found in the territory of the various Arabic-speaking countries. Kuwait , for instance , which is a small nation at the head of the Persian Gulf , with an area only three-fourths that of Massachusetts and a population of about half a million , posseses about one-fifth of all the known petroleum reserves in the world.

題型:問答題

翻譯:A major oil company usually initiates the sequence of events that leads to the drilling of oil and gas wells in foreign fields, but independent oil operators pay for most of the wells in the United States. In fact, about 80% of all wells drilled in the U.S. today are financed by independents.

題型:問答題