A. 30 networks and 6 hosts.
B. 6 networks and 30 hosts.
C. 8 networks and 32 hosts.
D. 32 networks and 18 hosts.
E. 14 networks and 14 hosts.
F. None of the above
您可能感興趣的試卷
你可能感興趣的試題
A. 255.255.255.192
B. 255.255.255.224
C. 255.255.255.240
D. 255.255.255.248
E. None of the above
A.192.168.15.17
B.192.168.15.14
C.192.168.15.29
D.192.168.15.16
E.192.168.15.31
F.None of the above
A.91
B.155
C.179
D.180
E.201
F.227
A.11001100-00111111-00011000
B.11000110-11000000-00011111
C.11001110-00011111-01100000
D.11001001-00111111-00110010
E.11001100-01111000-00011000
F.11111000-01100111-00011001
A.10010010
B.10011001
C.10101100
D.10101110
最新試題
How many usable sub network and usable hosts per subnet result in the network address 201.105.13.0 is sub netted with a mask of /26? ()
Which of the following contribute to congestion on an Ethernet network?()
A technician at TestKing needs to update the network documentation. One of the tasks includes documenting the name of the IOS image file of each router in the network.Which commands could be used to find this information?()
Which of the following describe router functions?()
What should the configuration register value be after successfully completing the password recover procedure and returning the router to normal operation? ()
Which Frame Relay feature is responsible for transmitting keepalives to ensure that the PVC does not shut down because of inactivity?()
TestKing.com has allocated the IP add 199.144.27.0 is its network, to provide flexibility for the LAN design, a subnet mask of 255.255.255.240 has been chosen. Which of the following address can be assigned to LAN on the resulting subnets.()
New switches have been purchased for a network upgrade. The objective for the network design emphasizes efficient, error-free transport instead of fast transport.Which switching mode should be configured on the new switches to provide error-free transport to the network? ()
Which of the following host addresses are member of networks that can be routed across the public Internet? ()
You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()