A.Backup data Manage problems Monitor network system
B.Report problems Manage servers and virtual environment Monitor the network
C.Monitor system health and network Install and manage AIX and IBM i Manage energy consumption
D.Monitor system health and network Manage servers and virtual environment Collect performance data
您可能感興趣的試卷
你可能感興趣的試題
A.PowerVM Standard Edition
B.VMControl Standard Edition
C.Hardware Management Console
D.IBM Systems Director Standard Edition
A.Energy management
B.Virtual image deployment
C.Virtual resource management
D.Networking device management
A.NPIV and vSCSI both require multipathing in VIO Server only.
B.NPIV requires multipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
C.NPIV requires multipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
D.NPIV requires multipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.
Which of the following meets these requirements?()
A.Create a system profile for each partition. Assign all needed resources as 'required'.
B.Define all system resources as 'desired' on the Testing partition. Activate only as needed.
C.Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
D.Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
A.Use Capacity on Demand to add the resources.
B.Use DLPAR to add the resources and select the 'permanent' option.
C.Use DLPAR to add the resources, and change the partition profile.
D.Use an Operating System command to permanently request the resources.
最新試題
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
Which system provides the highest performance per core, and the least cost for applications licensed per core?()