A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA).
What is the maximum number of IVE logical ports available to use inother LPARs?()
A.1
B.7
C.15
D.31
您可能感興趣的試卷
你可能感興趣的試題
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used.
Which of the following fulfills the customer requirements?()
A.Two dual-port PCIe adapters
B.A four-port PCIe Ethernet adapter
C.Four separate PCIe Ethernet adapters
D.Two embedded Integrated Virtual Ethernet adapters (IVE)
A.PCIe adapters are supported only in I/O drawers
B.PCI-X adapters are supported in both the CEC and in I/O drawers
C.PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawers
D.PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers
A.The Delivery Leader
B.The Opportunity Owner
C.The Solution Designer
D.The Subject Matter Expert
A.IBM i Edition
B.Express Edition
C.Standard Edition
D.Enterprise Edition
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance.
What will support the customer requirement at least cost?()
A.Build the logical partition infrastructure based on 6 or more VLANs.
B.Build the logical partition infrastructure based on two or more IVEs.
C.Build the logical partition infrastructure based on Partition Mobility.
D.Build the logical partition infrastructure based on redundant VIO Servers.
最新試題
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()