單項(xiàng)選擇題What is an advantage of using an HMC rather than IVM for system management?()

A.Support for a single VIO Server environment
B.Adapters can be dedicated or virtual for each LPAR environment
C.Interfaces with Systems Director to manage the Power Systems servers
D.Supports multiple Power Systems servers from a single point of control


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup.
Which solution provides tape library sharing with minimum operator intervention?()

A.Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the  library to the production partitions when needed.
B.Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library  connection to the AIX and Linux partition.Assign the library to the production partitions when needed.
C.Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and  tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable  the tape when finished.
D.Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a  virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production  partitions when needed.

2.單項(xiàng)選擇題What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

A.The new system requires 1 installed processor card for the GX++ bus adapter
B.The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
C.The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
D.The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

3.單項(xiàng)選擇題A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()

A.CoD and PCI hot-plug
B.DLPAR and Active Memory Sharing
C.Hot node add and hot node repair
D.D.ynamic processor failure and processor instruction retry

4.單項(xiàng)選擇題A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()

A.Enable automatic problem reporting from smit
B.Use IVM to enable console mirroring to IBM Remote Support.
C.Use the HMC to enable reporting through Electronic Service Agent.
D.Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.

最新試題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:單項(xiàng)選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項(xiàng)選擇題

Which system provides the highest performance per core, and the least cost for applications licensed per core?()

題型:單項(xiàng)選擇題

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()

題型:單項(xiàng)選擇題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()

題型:單項(xiàng)選擇題

Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()

題型:單項(xiàng)選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:單項(xiàng)選擇題

A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

題型:單項(xiàng)選擇題

Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()

題型:單項(xiàng)選擇題

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

題型:單項(xiàng)選擇題