A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()
A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.
您可能感興趣的試卷
你可能感興趣的試題
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.
Which of the following supports this requirement?()
A.Active Memory Server
B.Active Memory Sharing
C.Active Memory Pooling
D.Active Memory Expansion
A.1
B.2
C.4
D.8
A.Active Energy Manager
B.PowerVM Energy Manager
C.Power and Energy Manager
D.Thermal and Energy Manager
A.Support for a single VIO Server environment
B.Adapters can be dedicated or virtual for each LPAR environment
C.Interfaces with Systems Director to manage the Power Systems servers
D.Supports multiple Power Systems servers from a single point of control
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup.
Which solution provides tape library sharing with minimum operator intervention?()
A.Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.
B.Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library connection to the AIX and Linux partition.Assign the library to the production partitions when needed.
C.Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.
D.Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.
最新試題
Which of the following uses compression/decompression to increase the memory available for client workloads?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional hardware?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()