A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.
Which action allows the most efficient use of existing equipment?()

A.Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
B.Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
C.Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
D.Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

A.PowerVM offers partition mobility.
B.PowerVM can virtualize network and SAN resources.
C.PowerVM supports multiple operating systems running concurrently.
D.PowerVM allows an LPAR to use activated cores and memory without limitation.

2.單項(xiàng)選擇題

A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.
Which configuration will provide boot disk capability to all partitions?()

A.Use dual-split backplane in both enclosures for the three AIX partitions and the IBMi partition.
B.Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
C.Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split  backplane for the IBMi partition in the second enclosure.
D.Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane  mode in the second enclosure for the IBMi hosting partition.

3.單項(xiàng)選擇題A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

A.Configure 2CFFh combination fibre channel / gigabit Ethernet adapters
B.Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapter
C.Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet  adapter
D.Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet  adapter

最新試題

A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()

題型:?jiǎn)雾?xiàng)選擇題

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

題型:?jiǎn)雾?xiàng)選擇題

A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

題型:?jiǎn)雾?xiàng)選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:?jiǎn)雾?xiàng)選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()

題型:?jiǎn)雾?xiàng)選擇題

While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

題型:?jiǎn)雾?xiàng)選擇題