單項(xiàng)選擇題

An administrator receives a contract for a server install at a new building. Which of the followingshould be completed after installing the server?()

A. Log the administrator password used
B. Test the air temperature
C. Update the network diagram
D. Review the evacuation procedures

微信掃碼免費(fèi)搜題