單項選擇題公文印章蓋在()。

A.落款上
B.發(fā)送時間和落款之上
C.發(fā)文時間
D.發(fā)文時間上,落款下


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題按工藝專業(yè)化設(shè)計生產(chǎn)單位可以()。

A.提高工人的技術(shù)水平
B.生產(chǎn)周期短
C.減小資金占用
D.適應(yīng)能力差

2.單項選擇題()反映企業(yè)的生產(chǎn)總規(guī)模和總水平。

A.商品產(chǎn)值
B.凈產(chǎn)值
C.總產(chǎn)值
D.利潤

3.單項選擇題內(nèi)容型激勵理論,著重對激勵的()進(jìn)行研究。

A.原由和因素
B.過程
C.改造和轉(zhuǎn)化人的引為

4.單項選擇題()是產(chǎn)品質(zhì)量保證的首要環(huán)節(jié)。

A.設(shè)計研制
B.制造過程
C.質(zhì)量計劃
D.質(zhì)量目標(biāo)

5.單項選擇題下列哪個因素對企業(yè)人際關(guān)系的好壞起著決定作用()。

A.利益的一致性
B.態(tài)度的相對性
C.結(jié)構(gòu)的合理性
D.交往的密切性

最新試題

翻譯:There are two approaches to the problem of determining the fluid saturation within a reservoir rock. The direct approach is to measure, in the laboratory, the saturation of selected rock samples recovered from the parent formation. The indirect approach is to determine the fluid saturation by measuring some related physical property of the rock.

題型:問答題

翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.

題型:問答題

翻譯:It has been suggested that an effective oil source rock generates 10-40 bbl or oil per acre ft (0.0013-0.0052 cc/cc) for each one per cent of organic carbon. This is approximately 500-2000 ppm by weight.

題型:問答題

翻譯:For example ,the determination of the pump-setting depth and size of plunger that will lead to the maximum pumping rate in a particular well is a problem of considerable difficulty, which even today has not been fully or saris factorial solved; another interesting problem is that of gas anchors(bottom-hole separators); yet another is the interpretation of the results obtained form devices for determining the depth of the fluid level in the annulus during pumping.

題型:問答題

翻譯:THE OPEC oil cartel is about to turn 40, and the mood in the run-up to the grand heads-of-state party in Venezuela in less than three weeks time is jubilant. Not quite two years ago,oil was $10 a barrel and the cartel was on the brink of collapse. Now the oil price is well above $30 a barrel, and it shows little sign of coming down.

題型:問答題

翻譯:The first step in planning a well should be the gathering of all available data on past wells. In this respect it is important to be completely familiar with all sources of information, the availability of the sources, and the information normally associated with each source.

題型:問答題

翻譯:A major oil company usually initiates the sequence of events that leads to the drilling of oil and gas wells in foreign fields, but independent oil operators pay for most of the wells in the United States. In fact, about 80% of all wells drilled in the U.S. today are financed by independents.

題型:問答題

翻譯:Meanahile ,steel pipes that would carry the oil were being developed . These were the first oil pipelines which take the advantage of the fact the oil is a liqnid. The ideas of a pipeline were not new , water has been transported through pipes for handreds of year ,The oil pipeline were not accepted without a struggle, hower.

題型:問答題

翻譯:An acidizing treatment for a sandstone formation normally will consist of sequentially injecting three fluids---a preflush, the hydrofluoric acid hydrochloric acid mixture, and an after flush. These fluids serve definite purposes.

題型:問答題

翻譯:This chapter deals with the fundamental properties of reservoir rocks. The properties discussed are (1) porosity - a measure of the void space in a rock; (2) Permeability - a measure of the fluid transmissivity of a rock; and (3) fluid saturation - a measure of the gross void space occupied by a fluid. These properties constitute a set of fundamental parameters by which the rock may be described quantitatively.

題型:問答題