問答題

【簡答題】翻譯:The first step in planning a well should be the gathering of all available data on past wells. In this respect it is important to be completely familiar with all sources of information, the availability of the sources, and the information normally associated with each source.

答案: 第一步在設(shè)計井身方面收集以開采的井的所有有效的資料。要注意的是須熟悉完整的數(shù)據(jù)的全部原始資料原始資料的可利用性,每種原...
題目列表

你可能感興趣的試題

問答題

【簡答題】翻譯:Land maps are essential in establishing control wells and provide fundamental orientation. As Fig.2 illustrates, land maps which are readily available within most companies as well as readily available commercially, provide offset operators, total depth, formation tops and development dates. The land map is essential in establishing orientation and control.

答案: 陸地測繪圖在建立控制井時是基本的和預(yù)備基本的定位。陸地測繪圖和許多公司一樣要有有效的工業(yè)價值,預(yù)備補償操作機構(gòu),總深度構(gòu)...
問答題

【簡答題】翻譯:A major oil company usually initiates the sequence of events that leads to the drilling of oil and gas wells in foreign fields, but independent oil operators pay for most of the wells in the United States. In fact, about 80% of all wells drilled in the U.S. today are financed by independents.

答案: 型的石油公司開始著手事件的順序會導(dǎo)致油氣田鉆井大都在國外油田。但是獨立的石油作業(yè)者對大部分的井的花費都用在了美國。事實上...
微信掃碼免費搜題