A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
您可能感興趣的試卷
你可能感興趣的試題
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
A.provides
B.becomes
C.contains
D.comes
A.on
B.in
C.under
D.at
A.be carried out
B.encountered
C.be met with
D.be bringing
最新試題
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.
Freight rates are mostly charged().
When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
The carrier is entitled to()overboard goods which are dangerous.