A.loading
B.leaving
C.arriving
D.sailing
您可能感興趣的試卷
你可能感興趣的試題
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
A.spilling
B.leaking
C.dumping
D.All of the above
A.flat
B.up
C.upright
D.vertical
A.moors
B.moor
C.is moored
D.mooring
最新試題
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
How should you signal the crane operator to lower the boom and raise the load().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().
What is meant by the term“l(fā)uffing the boom”of a crane().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
Damage by()shall not be considered as handling damage.
The Master or person in charge of a ship shall ensure the crane record book shows the().
Most pedestal crane power is provided by().