A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
您可能感興趣的試卷
你可能感興趣的試題
A.spilling
B.leaking
C.dumping
D.All of the above
A.flat
B.up
C.upright
D.vertical
A.moors
B.moor
C.is moored
D.mooring
A.which
B.where
C.when
D.how
A.before
B.when
C.after
D.during
最新試題
They()loading at 1400 hours.
Most pedestal crane power is provided by().
How should you signal the crane operator to move slowly().
The Master or person in charge of a ship shall ensure the crane record book shows the().
The net productivity per gang-hour can be improved through a decrease of().
When discharging an oil cargo,the first consideration is to().
When using slings,cargo handlers should take all the following precautions except().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.