A.selected
B.collected
C.detected
D.effected
您可能感興趣的試卷
你可能感興趣的試題
A.act of God
B.lock-out
C.strike
D.paint fire
A.Aid in casting off
B.Direct the drift of the vessel
C.Aid in its recovery
D.Maintain maximum resistance to broaching
A.outboard strake of plating on each side of an innerbottom
B.outer strake of plating on each side of the main deck of a vessel
C.plate which sits atop the center vertical keel
D.uppermost continuous strake of plating on the shell of a vessel
A.Repairer
B.Customer
C.charterer
D.carrier
A.primers and paints
B.painters
C.promisers
D.compromisers
最新試題
When a line is spirally coiled about its end and lying flat on deck,it is said to be().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The terms ceiling and margin plate are associated with the().
When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
The stevedores have already stowed the porcelain ware()up to the deckhead.
What danger is presented if a waterspout passes over a ship?()
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
The process of lowering a boom to a horizontal position and onto its deck support is called().
Which type of link is generally used to connect shots of anchor chain().
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().