A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers.
How many and what kind of drawers are needed to connect these adapters?()
A.2 PCI-X drawers and 2 PCIe drawers
B.3 PCI-X drawers and 4 PCIe drawers
C.4 PCI-X drawers and 3 PCIe drawers
D.4 PCI-X drawers and 2 PCIe drawers
您可能感興趣的試卷
你可能感興趣的試題
A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).
Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()
A.LPAR-A with 1Gb FC HBA and SAN connection
B.LPAR-B with 2Gb FC HBA and SAN connection
C.LPAR-C with 4Gb FC HBA and SAN connection
D.LPAR-D with 8Gb FC HBA and SAN connection
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()
A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.
Which of the following supports this requirement?()
A.Active Memory Server
B.Active Memory Sharing
C.Active Memory Pooling
D.Active Memory Expansion
A.1
B.2
C.4
D.8
A.Active Energy Manager
B.PowerVM Energy Manager
C.Power and Energy Manager
D.Thermal and Energy Manager
最新試題
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
Which of the following uses compression/decompression to increase the memory available for client workloads?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()