A.Cranes are able to pick up and drop loads over a greater spotting area
B.Increased safety because the deck is clear of running and standing rigging
C.Simplicity of operation of the crane by its operator
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.It allows for rotation of the hook in the single mode
B.It is required to“twin-up”30-ton pedestal cranes
C.It is used to pick up light loads
D.It is used to rigidly connect two cranes
A.Stopping the boom
B.Topping or lowering the boom
C.Moving the boom left or right
D.All of the above
A.It prevents the load from swinging when the boom level is adjusted
B.Less power is needed when topping the boom with a load on the hook
C.It maintains the height of the load above the deck
D.All of the above
A.started
B.finished
C.completed
D.reported
A.Cranes/derricks
B.Crane/derrick cycles
C.Crane/derrick cycle time
D.Weight per package
最新試題
How should you signal the crane operator to move slowly().
Running an electric winch at slow speed over a long period of time causes().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
The net productivity per gang-hour can be improved through a decrease of().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Sudden starts or stops of the boom is likely to cause all of the following except().
What does “evel-luffing” accomplish during crane operations().
Damage by()shall not be considered as handling damage.
What is/are the advantage(s)of cranes over conventional cargo booms().
They()loading at 1400 hours.