A.does not exceed
B.should exceed
C.should be up to
D.should be no more than
您可能感興趣的試卷
你可能感興趣的試題
A.environmental loading
B.variable loading
C.fixed loading
D.basic loading
A.loading
B.leaving
C.arriving
D.sailing
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
A.spilling
B.leaking
C.dumping
D.All of the above
最新試題
Official draft measurements should be()by authorized persons,agreed by both parties involved.
What is/are the advantage(s)of cranes over conventional cargo booms().
Damage by()shall not be considered as handling damage.
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
What is the purpose of the equalizing beam aboard a crane vessel().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Which statement comparing a shipboard crane to conventional gear is TRUE().
Pedestal cranes have limit switches to restrict movement of which function(s)().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().