單項(xiàng)選擇題Where a propeller shaft passes through the hull,water is prevented from entering by means of a().

A.stuffing box
B.propeller boss
C.seacock
D.stop-water


您可能感興趣的試卷

你可能感興趣的試題

3.單項(xiàng)選擇題When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().

A.is always effective immediately
B.includes a statement of each condition requiring corrective action
C.must be in writing before it takes effect
D.All of the above

4.單項(xiàng)選擇題The object of the both-to-blame collision clause is().

A.to free the carrying ship from liability
B.to free the non-carrying ship from liability
C.to free the ship in the wrong from liability
D.to free the ship not to blame from liability

5.單項(xiàng)選擇題The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

A.supplies or attempts to supply
B.imposes or attempts
C.complies or attempts to comply
D.provides or attempts to provide

最新試題

The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

題型:單項(xiàng)選擇題

Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.

題型:單項(xiàng)選擇題

Freight rates are mostly charged().

題型:單項(xiàng)選擇題

If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().

題型:單項(xiàng)選擇題

Delivery of a vessel to a charterer is called().

題型:單項(xiàng)選擇題

Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.

題型:單項(xiàng)選擇題

The object of the both-to-blame collision clause is().

題型:單項(xiàng)選擇題

The carrier is entitled to limit his liability to the stated sum per package or unit even if he failed to exercise due diligence to make the vessel().

題型:單項(xiàng)選擇題

If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.

題型:單項(xiàng)選擇題

Where a propeller shaft passes through the hull,water is prevented from entering by means of a().

題型:單項(xiàng)選擇題